SB2196: POWERING UP ILLINOIS ACT

Legislative Summary

Creates the Powering Up Illinois Act. Defines terms. Sets forth findings. Requires an electric utility that operates within the State to (i) upgrade the State's electrical distribution systems as needed and in time to achieve the State's decarbonization goals, and implement federal, State, regional, and local air quality and decarbonization standards, plans, and regulations, (ii) conduct sufficient advance planning, engineering, and construction of increased distribution of system capacity by advance ordering transformers and other needed equipment so that customers can be energized without substantial delay, (iii) promptly energize new customers, including by ensuring that new housing, new businesses, and new charging for light-duty, medium-duty, and heavy-duty vehicles and off-road vehicles, vessels, trains, and equipment can be used without delay caused by a failure of the utility to implement energization projects, (iv) promptly upgrade service when needed by customers, (v) allow customers seeking energization to choose an optional flexible connection agreement, which shall provide a tariffed, voluntary utility offering that requires customers to agree to specified service levels as a requirement of energization or interconnection through the use of demand response technology that limits the net import and export of electricity at the point of common coupling to remain within the rated capacity limits of a customer's existing service connection or distribution circuit, either on a permanent basis or to allow for immediate project operations before service or distribution system upgrades are completed, and (vi) recruit, train, and retain an adequately sized and qualified workforce to carry out the planning, engineering, and construction of electrical distribution systems needed to promptly serve customers seeking energization and service upgrades without sacrificing other necessary activities of the workforce. Sets forth provisions concerning: the staffing of an electrification team; electric utility requirements; recovery of costs; and safety standards. Effective immediately.

Demographic Impact

Overall analysis of equity impact

80% Positive
High ConfidenceView detailed demographic breakdown ↓

Unlock Full Demographic Insights

Go beyond the overall score.

Gain a deeper understanding of this bill's potential impact across diverse communities, including detailed breakdowns by category and subgroup. Access to this granular analysis helps ensure equitable outcomes.

Enable full analysis features for your organization.

Contact Sales to Learn More

Or email us directly at sales@legiequity.us.

Bill History

2/7/2025
Filed with Secretary by Sen. Adriane Johnson
Senate
2/7/2025
First Reading
Senate
2/7/2025
Referred to Assignments
Senate
3/4/2025
Added as Co-Sponsor Sen. Javier L. Cervantes
Senate
3/5/2025
Added as Co-Sponsor Sen. Laura M. Murphy
Senate
3/6/2025
Added as Co-Sponsor Sen. Mike Simmons
Senate
4/1/2025
Assigned to Energy and Public Utilities
Senate
4/1/2025
Rule 2-10 Committee Deadline Established As April 11, 2025
Senate
4/4/2025
Added as Co-Sponsor Sen. Graciela Guzmán
Senate
4/11/2025
Rule 2-10 Committee/3rd Reading Deadline Established As May 9, 2025
Senate
4/23/2025
Added as Co-Sponsor Sen. Chris Balkema
Senate

Status Information

Current Status
Introduced(2/7/2025)
Chamber
Senate
Committee
Energy and Public Utilities(Senate)

Documents

Introduced
Bill Text2/7/202560.8 KB