2023 Regular Session • Louisiana Legislature
SB83
Legislative Summary
Provides for certain change orders when certain unit prices are contained in the initial contract. (8/1/23)
Demographic Impact
Overall analysis of equity impact
Neutral
Low ConfidenceView detailed demographic breakdown ↓Unlock Full Demographic Insights
Go beyond the overall score.
Gain a deeper understanding of this bill's potential impact across diverse communities, including detailed breakdowns by category and subgroup. Access to this granular analysis helps ensure equitable outcomes.
Enable full analysis features for your organization.
Contact Sales to Learn MoreOr email us directly at sales@legiequity.us.
Bill History
3/29/2023
Prefiled and under the rules provisionally referred to the Committee on Transportation, Highways and Public Works.
Senate
4/10/2023
Introduced in the Senate; read by title. Rules suspended. Read second time and referred to the Committee on Transportation, Highways and Public Works.
Senate
4/24/2023
Reported with amendments.
Senate
4/25/2023
Read by title. Committee amendments read and adopted. Ordered engrossed and passed to third reading and final passage.
Senate
4/26/2023
Read by title, passed by a vote of 33 yeas and 0 nays, and sent to the House. Motion to reconsider tabled.
Senate
4/27/2023
Received in the House from the Senate, read by title, lies over under the rules.
House of Representatives
5/1/2023
Read by title, under the rules, referred to the Committee on Transportation, Highways and Public Works.
House of Representatives
5/15/2023
Reported with amendments (10-0). Referred to the Legislative Bureau.
House of Representatives
5/16/2023
Reported without Legislative Bureau amendments.
House of Representatives
5/17/2023
Read by title, amended, passed to 3rd reading.
House of Representatives
5/23/2023
Scheduled for floor debate on 05/25/2023.
House of Representatives
5/25/2023
Read third time by title, amended, roll called on final passage, yeas 94, nays 0. Finally passed, ordered to the Senate.
House of Representatives
5/26/2023
Received from the House with amendments.
Senate
5/29/2023
Amendments proposed by the House read and rejected by a vote of 39 yeas and 0 nays.
Senate
5/30/2023
Notice of Senate rejecting House amendments.
House of Representatives
5/30/2023
Senate conference committee members appointed: Womack, McMath, and Morris.
Senate
5/30/2023
Notice of Senate conferees appointed.
House of Representatives
6/5/2023
House conferees appointed: Gadberry, Wright, and Coussan.
House of Representatives
6/5/2023
Notice House Conference Committee members appointed.
Senate
6/6/2023
Conference Committee report received. Lies over under the rules.
House of Representatives
6/6/2023
Conference committee report received.
Senate
6/6/2023
Scheduled for floor debate on 06/08/2023.
House of Representatives
6/8/2023
Conference Committee Report read, roll called, yeas 88, nays 3. The Conference Committee Report was adopted.
House of Representatives
6/8/2023
Notice House adopted the Conference Committee Report.
Senate
6/8/2023
Conference Committee Report read; adopted by a vote of 32 yeas and 1 nays.
Senate
6/8/2023
Notice of Senate adoption of Conference Committee Report.
House of Representatives
6/8/2023
Enrolled. Signed by the President of the Senate.
Senate
6/8/2023
Signed by the Speaker of the House.
House of Representatives
6/8/2023
Sent to the Governor by the Secretary of the Senate.
Senate
6/13/2023
Signed by the Governor. Becomes Act No. 329.
Senate
6/13/2023
Effective date 8/1/2023.
Senate
Amendments
Senate Committee Amendment #664 THPW Proposed
Senate Committee Amendment #664 THPW Proposed
Not Adopted
Senate Committee Amendment #630 THPW Draft
Senate Committee Amendment #630 THPW Draft
Not Adopted
House Committee Amendment #2341 THPW Draft
House Committee Amendment #2341 THPW Draft
Not Adopted
House Committee Amendment #2893 THPW Proposed
House Committee Amendment #2893 THPW Proposed
Not Adopted
House Floor Amendment #3587 Thomas Adopted
House Floor Amendment #3587 Thomas Adopted
Adopted
Roll Call Votes
House Vote on SB 83 ADOPT CONFERENCE REPORT (#1188)
6/8/2023
88
Yea
3
Nay
0
Not Voting
14
Absent
Result: PASSED
Senate Vote on SB 83 ADOPT (#986)
6/8/2023
32
Yea
1
Nay
0
Not Voting
6
Absent
Result: PASSED
Senate Vote on SB 83 REJECT (#518)
5/29/2023
39
Yea
0
Nay
0
Not Voting
0
Absent
Result: PASSED
House Vote on SB 83 FINAL PASSAGE (#711)
5/25/2023
94
Yea
0
Nay
0
Not Voting
11
Absent
Result: PASSED
Senate Vote on SB 83 FINAL PASSAGE (#124)
4/26/2023
33
Yea
0
Nay
0
Not Voting
6
Absent
Result: PASSED
Status Information
Current Status
Passed(6/13/2023)
Chamber
Senate
Sine DiePrior Session
Sponsors
Republican: 1
Primary Sponsor

Glen Womack
Republican