2025-2026 Regular SessionNew York Legislature

A06951

Legislative Summary

Provides that subsequent requests for an extension of a suspension period for certain rate, charge or other changes by utilities shall require approval by the public service commission and shall be valid for one month, after which the commission shall review and determine the necessity of a further extension; provides limitations on retroactive rate recovery by utilities.

Bill History

3/18/2025
referred to energy
Assembly

Status Information

Current Status
Introduced(3/18/2025)
Chamber
Assembly
Committee
Energy(Assembly)

Sponsors

Democrat: 1

Documents

Introduced
Bill Text3/18/202512.9 KB