2025 Regular SessionRhode Island Legislature

S0380: Requires the public utilities commission (PUC) to produce a report by January 1, 2026 and each January 1 thereafter, on the ability for the current electric grid to handle the electrification load need to power cars, buildings, and heating of homes.

Legislative Summary

PUBLIC UTILITIES AND CARRIERS -- PUBLIC UTILITIES COMMISSION - Requires the public utilities commission (PUC) to produce a report by January 1, 2026 and each January 1 thereafter, on the ability for the current electric grid to handle the electrification load need to power cars, buildings, and heating of homes.

Demographic Impact

Overall analysis of equity impact

Neutral
Low Confidence

Unlock Full Demographic Insights

Go beyond the overall score.

Gain a deeper understanding of this bill's potential impact across diverse communities, including detailed breakdowns by category and subgroup. Access to this granular analysis helps ensure equitable outcomes.

Enable full analysis features for your organization.

Contact Sales to Learn More

Or email us directly at sales@legiequity.us.

Bill History

2/26/2025
Introduced, referred to Senate Commerce
Senate
4/4/2025
Scheduled for hearing and/or consideration (04/08/2025)
Senate
4/8/2025
Committee recommended measure be held for further study
Senate

Status Information

Current Status
Introduced(2/26/2025)
Chamber
Senate
Committee
Commerce(Senate)

Documents

Introduced
Bill Text2/26/202513.2 KB