2025 Regular Session • Rhode Island Legislature
H5845: Requires Rhode Island water suppliers to prepare a resilience assessment and a response plan for the risk of flooding.
Legislative Summary
WATERS AND NAVIGATION -- PUBLIC DRINKING WATER SUPPLY SYSTEM PROTECTION - Requires Rhode Island water suppliers to prepare a resilience assessment and a response plan for the risk of flooding.
Bill History
2/28/2025
Introduced, referred to House Environment and Natural Resources
House of Representatives
3/14/2025
Scheduled for hearing and/or consideration (03/20/2025)
House of Representatives
3/20/2025
Committee recommended measure be held for further study
House of Representatives
Status Information
Current Status
Introduced(2/28/2025)
Chamber
House of Representatives
Committee
Environment and Natural Resources(House of Representatives)
