SB346: Net energy metering; solar interconnection, cost recovery.
Legislative Summary
Net energy metering; solar interconnection; cost recovery. Provides that an electric distribution company shall pay $1 per kilowatt per day for the costs of lost electricity production for any and all delays beyond the regulatory notice period required by State Corporation Commission related to net energy metering. The bill requires that, for the purposes of net energy metering, an eligible customer-generator shall bear all reasonable costs of equipment required at the eligible customer-generator's side of the meter for the interconnection to the supplier's electric distribution system, including reasonable and prudent costs of additional controls, tests, or liability insurance. Additionally, the bill allows for cost recovery by Phase I and Phase II Utilities for electric distribution grid transformation projects that support the interconnection of generating facilities using energy derived from sunlight that are owned or contracted by eligible customer-generators, subject to the Commission finding those costs to be reasonable and prudent in accordance with existing law.
Demographic Impact
Overall analysis of equity impact
Unlock Full Demographic Insights
Go beyond the overall score.
Gain a deeper understanding of this bill's potential impact across diverse communities, including detailed breakdowns by category and subgroup. Access to this granular analysis helps ensure equitable outcomes.
Enable full analysis features for your organization.
Contact Sales to Learn MoreOr email us directly at sales@legiequity.us.